banner
Home / Products / Flange Facing
Products
Pipe Fittings Bf (blind flange)

Pipe Fittings Bf (blind flange)

Package size per unit product 7.00cm * 8.00cm * 4.00cm Gross weight per unit product 17.000kg The blind plate is mainly
Basic Info
Model NO. DN15-DN2000
Standard ANSI, DIN, GB, JIS, GOST, BSW
Type Welding Flange
Material Stainless Steel
Structure Round
Connection Welding
Sealing Surface RF
Manufacturing Way Forging
Thickness Standard Thickness
Pressure High Pressure
Usage Joining Pipe Lines
Processing Mode Machining
Specification DN15-DN2000
Trademark Pengxin
Origin Cangzhou, China
HS Code 1309960319
Production Capacity 500000
Packaging & Delivery
Package size per unit product 7.00cm * 8.00cm * 4.00cm Gross weight per unit product 17.000kg
Product Description
The blind plate is mainly used to completely isolate the production medium to prevent the shut-off valve from being closed tightly, affecting production, and even causing accidents. The blind plate should be set in the part where isolation is required, such as the equipment nozzle, before and after the shut-off valve or between two flanges, and it is often recommended to use a figure 8 blind; Insert plates (round blinds) can also be used for single-use parts such as pressing and purgingIt is generally divided into four types: forging, casting and forging, medium plate cutting, and casting. Among them, the price of forging products is the highest, followed by medium plate, and casting and forging are the lowest. Casting is the most secondary process. And the quality is good for forging and medium plate, and casting and forging is slightly worse.

 

1. In the original start-up preparation stage, when the strength test or tightness test of the pipeline is carried out, it cannot be carried out simultaneously with the connected equipment (such as turbine, compressor, gasifier, reactor, etc.), and a blind plate should be set at the connection between the equipment and the pipeline.
2. When the device stops, if the pipeline is still running, a blind plate is set at the shut-off valve.
3. When the device is a multi-series, the total pipeline from outside the boundary area is divided into thousands of pipes into each series, and a belly plate is set at the shut-off valve of each sub-pipeline.
4. When the device is to be regularly repaired, inspected or switched to each other, when the equipment involved needs to be completely isolated, a blind plate is set at the shut-off valve.
5. When the process pipeline of pressure filling pipeline and replacement gas pipeline (such as nitrogen pipeline and compressed air pipeline) is connected to the equipment, a belly plate is set at the shut-off valve.
6. The low point of equipment and pipelines is cleaned, if the process medium needs to be concentrated in a unified collection system, a blind plate is set after shut-off valve.
7. The exhaust pipe, liquid discharge pipe and sampling pipe of the equipment and pipeline should be set with blind plates or wire plugs behind the valve. Except for non-toxic, non-hazardous to health and non-explosive materials.
8. When the device is constructed in phases, there are interconnected pipelines set up at the shut-off valve to facilitate subsequent engineering construction.
9. When the device is in normal production, some auxiliary pipelines that need to be completely cut off should generally also be set up with blind plates. [1
carbon steel Board blindness
Standard: ASME; ANSI/DIN; BS; JIS; EN; ...
Raw material: Carbon
Size: 0.25"~56"~max.
Type: WN; SO; BL; SW; PL; THRD...
Facing: RF; RTJ; FF; FM; M; T; G; ...
Pressure: Standard

Pipe Fittings Bf (blind flange)

Pipe Fittings Bf (blind flange)

Pipe Fittings Bf (blind flange)

Pipe Fittings Bf (blind flange)

 

Pipe Fittings Bf (blind flange)

 




Q: Are you a trading company or a manufacturer?
A:We are a manufacturer ,we are integrated company of industry and tradeQ:Why should I choose you?* You are promised to obtain the best quality, price, and service.* Wide excellent experiences with after-sale service.* Every process will be checked by responsible QC which ensures every product's quality.*We pay attention to have long-term cooperation with our clients , treat every client seriouslyQ:Do you have experience for big projects ?
A:yes , we do .we have good experince for many big project , such as the power plant , Nuclear power station , oil refiningproject , naturalgas project ...Abillity to work with big project
Q: Can you produce the products according to my own drawings?
A: Yes, we can produce the products according to your drawings.we have profession engineers in our factory .